Taranto Port Logistic Project

In addition to the new platform, the wider Port of Taranto Logistics Project, costing a total of 215 million Euros, leads to the creation of other facilities:

  • The Piers Road, which will connect all quays and piers in the Port of Taranto and improve links with the national road network
  • Widening of Pier 4, from 80 metres to 220 metres, together with new operating areas on reclaimed land and a new quay with a draught of 12.0 metres
  • Creation of a new wet dock west of Pier 4.
  • Autorità Portuale di Taranto
  • Independent Engineering Services during Design and Construction Fases
  • 2011-2020
  • Taranto
  • Infrastructure